Prestige Power & Energy

Three disciplines, one designed system.

Solar design and install, battery storage, live monitoring. Delivered by the same senior designer, end-to-end. Below is the actual scope of works for each — what's included, what it costs, where the footnotes are.

A · Solar

Solar design & install.

Lead time
~3 weeks*
Typical install
1 day*
Panels
Tier-1*
Workmanship
[WARRANTY_YEARS] yr
Rebate
STC zone-3

Bill-driven sizing. We start with twelve months of usage data, model your roof from satellite, and design a layout that respects your shading, your future upgrades, and your budget. The senior designer who quoted you signs off the final drawing before it goes to the crew.

Tier-1 panels*, string-level monitoring, full STC zone-3 rebate handled in-house. No upsell on the day, no surprise variations after install.

Scope of works

  • 12-month bill analysis
  • Satellite roof model
  • Shading & orientation study
  • STC rebate application
  • Tier-1 panels*
  • Inverter sized to load
  • String-level wiring
  • Same-day commissioning
  • Monitoring portal access
  • Workmanship cover

B · Storage

Battery storage.

Sizing logic
Daytime profile
Rebate
CHBP eligible
Mfr warranty
10 yr*
Backup option
Single circuit

Most battery quotes you'll get in SE QLD are sized to the inverter. We size to your daytime usage profile — what you actually export between 9am and 4pm versus what you consume — so the battery has real work to do, not just spec-sheet capacity.

Cheaper Home Batteries Program (CHBP) eligible across our service area. Optional backup-circuit installation for outage resilience on a single circuit (typically fridge plus lighting; not a whole-home UPS).

Scope of works

  • Daytime usage-profile analysis
  • Battery sized to consumption
  • CHBP rebate handled in-house
  • Optional backup circuit
  • Inverter coupling check
  • Per-cell telemetry
  • Commissioning & handover
  • Mfr warranty paperwork
  • Fault response under SLA

C · Monitoring

Monitoring & care.

Telemetry
Per-string
Fault SLA
24 h*
Account contact
Senior designer
Review cadence
Quarterly

From the moment the system is commissioned, you get per-string telemetry — not just whole-system output. If a single panel under-performs, we see it before you do, and we open a service ticket on your behalf.

Faults raised in the portal get a response within 24 hours*. The senior designer who built your system stays on your account — you don't get re-routed to a generic support queue or a different account manager every quarter.

Scope of works

  • Per-string telemetry
  • Customer portal access
  • 24 h fault SLA*
  • Senior designer on account
  • Quarterly performance review
  • Firmware updates handled
  • Annual yield report

How we differ from a typical SE QLD installer.

Plain comparison. The "typical installer" column is what we hear from homeowners switching to us — not a specific competitor.

Dimension
Prestige PE
Typical installer
Quote built by
Senior designer, named
Sales rep, then drafted later
Battery sizing
Daytime usage profile
Matched to inverter
Monitoring granularity
Per-string telemetry
Whole-system only
After-install contact
Same designer, named
Generic support queue
Fault response
24 h SLA*
Best effort
Quote revisions
Versioned, customer-visible
Verbal, opaque

Ready to see what your roof can do?

Send twelve months of bills. Senior designer drafts a system with real numbers. No site visit yet, no commitment.

Begin design